LHC Crab Cavity
F. Zimmermann and U. Dorda, Progress of Beam-Beam Compensation Schemes, Proc. LHC-LUMI-05 Workshop Arcidosso
US-LARP mini-Workshop on LHC IR Upgrades, FNAL, 3–4 October 2005
CERN meeting 27.07.2006, Frank's slides (critical points), Rogelio's slides (crab optics), picture of single spoke cavity (from Joachim)
CERN meeting 11.08.2006, Rama's slides (LHC Crab Cavity - A Preliminary Design)
CERN meeting 19.09.2006, Rogelio's slides (optics with 8 mrad crossing angle), Rama's slides (baseline crab cavity design, orbit and tune shift for two crab cavities per ring), email discussion on noise by Fritz, Joachim, and Rama ; Phase Noise Measurements with Rohde & Schwarz FSE Spectrum Analyzers, Agilent Signal Source Analyzer E5052A
CERN coffee discussion 21.09.2006, with Fritz Caspers et al., beam phase noise and tolerances
CERN coffee discussion 22.9.2006, with Tom Taylor et al, on the final quadrupoles and crossing angle
CERN discussion 12.10.2006, luminosity scope from Rogelio, Rogelio's slides?, Rama's slides?, Joachim's slides?, Ulrich's slides
Residual Phase Noise Measurements, Comb Generators, Picosecond Pulse Labs (from Fritz Caspers)
Picture of KEKB crab cavity with cryostat, piezos and coaxial (from Rogelio Tomas)
KEKB Crab Cavity Commissioning, Rama Calaga, BNL/LARP, March 15, 2007
CERN meeting, 12 December 2007; Rogelio Tomas, Crab Scenarios; Yi-Peng Sun, Summary of Chao-Hoffstaetter paper
Recent work about crab cavity, Yi-Peng Sun, LCU meeting, 23 January 2008
BNL/LARP/CARE-HHH LHC-CC08 Mini-Workshop on LHC Crab Cavities, BNL, 25-26 February 2008
Notes on Transit in Deflecting Mode Pillbox Cavities, Version of August 20, 2007